We appreciate you following the Associations guidelines for architectural changes to your home and we are happy to see our homeowners improving the aesthetics and function of their homes.

If you are planning on making changes to the exterior of your home, please remember to obtain and submit an Architectural Change Request form, prior to making the change.

The Architectural Committee will review your form with regards to the standards laid out in the CC&R’s and the Rules and Regulations.

General Architectural Application (CLICK HERE)

Applications must be submitted at least ten (10) business days prior to the Board Meeting, in order to be reviewed at that meeting. Please note that incomplete applications will not be reviewed.

Complete applications that are submitted within the time frame noted above will be reviewed at a Board Meeting, generally held on the 4th Monday of every other (odd) month.

 

Security Screen Doors

If you are interested in installing a security screen door, the Board of Directors has pre-approved the three styles seen below.

An architectural application is required; however, there is an expedited approval for homeowners that wish to install following screen doors at their own expense. Any other screen door or security door will require the typical architectural review process.

Security screen doors are for front doors only.

All doors must be black in color, with matte silver hardware (locks and handles).

Installation and maintenance is the responsibility of the homeowner, as well as any needed repairs to the stucco or door jam, caused by the installation.

Hard Flooring

Hard flooring (including wood, laminate, tile or other) is prohibited in 2nd floor units, except in the bathrooms, dressing area (if any), kitchen, and entry area. Any 1st floor unit owners who plan to install carpet or non-tile hard flooring (laminate, wood, vinyl) must first install a wall-to-wall vapor barrier onto the concrete slab to protect the flooring from potential water damage from moisture wicking up from the ground and through the porous concrete. A moisture barrier is not necessary nor recommended underneath tile floors. The Association will not be responsible for any water intrusion issues in first floor units that choose to replace their carpeting with hard flooring.

 

Windows & Door Replacement

  1. Windows & door frames must be vinyl and the approved dark brown color.
  2. Windows & doors must slide horizontally.
  3. Windows & doors cannot contain grids or any tinting.
  4. All windows in the unit must be replaced at the same time.
  5. All glass must meet current fire code requirements, and at least one (1) of the panes in each window must be tempered glass.